A Story can be moved from one iteration to another if the work needs to be delayed or moved forward.
Moving a Story to an Iteration
- Navigate to Iteration Planning.
- Expand Teams, then Team Overview, then select Iteration Planning from the left navigation menu.
- Filter by the appropriate Team and Team Iterations, if desired.
- Refer to Filtering the Content of a View or Folder for instructions.
- Hold Ctrl (command) to select multiple Iterations. Or use the checkboxes to select multiple Iterations.
- Drag the Story to the desired Iteration, or adjust the Iteration in the Story details:
- Select the Story to open the details.
- Expand the Info section on the right menu.
- Next to Team Iteration, select the edit button (pencil icon).
- From the dropdown, select the desired Iteration.